Runway 5-23 Rehabilitation - Groton-New London Airport
Agency: | State Government of Connecticut |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD00170692312999920 |
Posted Date: | Mar 26, 2024 |
Due Date: | Apr 23, 2024 |
Solicitation No: | IFB No. 2024-009 |
Source: | To access the bid document, please visit the agency's website at below and search by your matched keyword: https://portal.ct.gov/DAS/CTSo... |
The project consists of rehabilitating the full Runway 5-23, the intersection of Runway 5-
23/Runway 15-33 and stub taxiways (Taxiway C, D, & E) pavements to past the hold position
markings, airfield lighting, and airfield signs. The project work will include: pavement milling;
underlying surface preparations (i.e. crack repairs); new surface pavement; pavement grooving;
airfield electrical work with new elevated and in-pavement runway and taxiway edge lights,
elevated runway end and threshold lights replacement; new distance-to-go and guidance signs,
two new regulators in the electrical vault, new conduit and new cable; relocation and installation
of a new wind cone and segmental circle; existing drainage structure rehabilitation; pavement
marking; transplanting of rare species plants for impacted areas; restoration of growth for
disturbed areas; and other minor miscellaneous items.
Start Date: Mar 26, 2024
End Date: Apr 23, 2024
Connecticut Airport Authority
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.